A10 Foxton Railway Crossing

You are here: Home » Futures » A10 Foxton Railway Crossing

Type
Bypass or realignment for use by all traffic
Status
In planning or on hold
Authority
Cambridgeshire County Council
Cost
£ 6.5m
Finance
Unknown
Timescale
2009-2011
Length
1.0 km (0.6 miles)

Scheme Outline

Replacement of the existing level crossing with a bridge over the railway (approximately 100m further west), with the existing level crossing being closed to traffic (except for pedestrian access).

This is a venerable project, appearing in the 1954 Cambridge County Development Plan, and probably even earlier.

More information

Official website
PDF file www.cambridgeshire.gov.uk/.../LTP04C7.pdf