A61 Leeds Inner Ring Road Stage 7
You are here: Home » Futures » A61 Leeds Inner Ring Road Stage 7
CBRD Futures is no longer being updated as of July 2012 and information on this page may now be out of date.
- Type
- Road for use by all traffic
- Status
- Completed
- Authority
- Leeds City Council
- Cost
- £ 50m
- Finance
- LCC/Central Government
- Timescale
- 2006-2008
- Length
- 1 km (0.6 miles)
Scheme Outline
A mostly on-line upgrade of sections of existing A61 to connect M621 J4 to the sections of road already improved in Stage 6 at Hunslet. The new road will be dual-two lane standard and partly grade-separated, featuring a 500m elevated section south of the River Aire.
Progress
| 1 November 2008 | The road is now fully open to traffic. |
|---|
It's over!
This scheme has been completed, so it's no longer possible to edit any of the information on this page.
This scheme was last updated on 1 November 2008.