A64 Bilbrough Top Improvement
You are here: Home » Futures » A64 Bilbrough Top Improvement
CBRD Futures is no longer being updated as of July 2012 and information on this page may now be out of date.
- Type
- Road for use by all traffic
- Status
- Completed
- Authority
- Highways Agency
- Cost
- Unknown
- Finance
- Central Government
- Timescale
- 2004-2005
- Length
- Unknown
Scheme Outline
Replacement of the existing crossroads on the A64 between Tadcaster and York with a grade-separated junction, including the installation of a new flyover. This section of road is running well under capacity, with substandard junctions and a poor alignment. It was built during the 1930's, but at each end is connected directly on to modern grade-separated dual carriageway. Bilbrough Top is one of the most dangerous junctions on the route.
Progress
| 14 September 2004 | Construction of the new flyover is well under way. |
|---|---|
| 14 July 2005 | The new junction is opened to traffic. |
It's over!
This scheme has been completed, so it's no longer possible to edit any of the information on this page.
This scheme was last updated on 26 October 2008.