A650 Bingley Relief Road
You are here: Home » Futures » A650 Bingley Relief Road
CBRD Futures is no longer being updated as of July 2012 and information on this page may now be out of date.
- Type
- Road for use by all traffic
- Status
- Completed
- Authority
- Highways Agency
- Cost
- £ 48m
- Finance
- Central Government
- Timescale
- 2001-2004
- Length
- 5 km (3 miles)
Scheme Outline
Construction of a new dual-two lane road, including a grade separated junction partway along, between the A650 at Shipley and the existing dual carriageway at Keighley. Because of the steep geography of the area the road is being constructed in spare land alongside the Leeds-Liverpool Canal through the centre of Bingley.
It's over!
This scheme has been completed, so it's no longer possible to edit any of the information on this page.
This scheme was last updated on 23 October 2008.