A650 Bingley Relief Road

You are here: Home » Futures » A650 Bingley Relief Road

CBRD Futures is no longer being updated as of July 2012 and information on this page may now be out of date.

Type
Road for use by all traffic
Status
Completed
Authority
Highways Agency
Cost
£ 48m
Finance
Central Government
Timescale
2001-2004
Length
5 km (3 miles)

Scheme Outline

Construction of a new dual-two lane road, including a grade separated junction partway along, between the A650 at Shipley and the existing dual carriageway at Keighley. Because of the steep geography of the area the road is being constructed in spare land alongside the Leeds-Liverpool Canal through the centre of Bingley.