M2 Widening
You are here: Home » Futures » M2 Widening
CBRD Futures is no longer being updated as of July 2012 and information on this page may now be out of date.
- Type
- Road under motorway restrictions
- Status
- Completed
- Authority
- Highways Agency
- Cost
- Unknown
- Finance
- Central Government
- Timescale
- 2000-2003
- Length
- 14.4 km (9 miles)
Scheme Outline
Upgrade of the existing two-lane M2 to three and four lane plus hard shoulder carriageways as far as junction 4. The upgrade is largely 'parallel' - a second carriageway is constructed alongside the existing motorway, with the present two carriageways eventually becoming one single wide carriageway. The scheme also includes massive upgrades to substandard junctions and the construction of a second Medway Bridge.
It's over!
This scheme has been completed, so it's no longer possible to edit any of the information on this page.
This scheme was last updated on 23 October 2008.