M60 Widening J5-8
You are here: Home » Futures » M60 Widening J5-8
CBRD Futures is no longer being updated as of July 2012 and information on this page may now be out of date.
- Type
- Road under motorway restrictions
- Status
- Completed
- Authority
- Highways Agency
- Cost
- £ 102m
- Finance
- Central Government
- Timescale
- 2004-2006
- Length
- 6.4 km (4 miles)
Scheme Outline
Widening of the M60 between junctions 5 and 8, to include dual-three lane main carriageways and dual-two lane carriageways alongside. The two-lane carriageways will access junctions, while the three-lane ones will pass through from 5 to 8 without entry or exit points. Junctions 5 and 7 will be remodelled and the A6144(M) will lose motorway status as part of the works.