M32 J3 Lower Ashley Road Interchange

Layout and signage

  B4051




    B4051
A4320





  Knowle
Bath
A4320 (A4)
City Centre
A4032

Lane configuration

LanesLanesLanesLanesLanes

  • Lane 1 is gained from the entry sliproad.
  • Lane 2 continues, with option to exit.
  • Lane 3 continues ahead.

LanesLanesLanesLanesLanes

  • Lane 1 exits and does not return.
  • Lane 2 continues ahead.
  • Lane 3 continues ahead.

Other events

  • Signs 60mph speed limit begins
  • Signs Start of motorway regulations
  • Signs End of motorway regulations
  • Signs 40mph speed limit begins

In this section

What's new

Oxford's Ground Zero

Oxford's Zero Emission Zone is just a trial, but transport policy in Oxford has become the catalyst for pitched battles and drawn in protestors from across the UK. What's happening to this genteel university town?

2023 end of year message

It’s been a quiet year for Roads.org.uk, but we will be back to our usual schedule soon.

London’s other forgotten motorways

We’ve spent years documenting the unbuilt urban motorway network planned for London. Today we’re unveiling more new routes that have never been seen before!

Share this page

Have you seen...

M1 under construction

Pictures taken as the first section of the M1 was being built in 1958-9, with all its unique architecture still under construction.

About this page

Published

Last updated