M9 M8 J2 Claylands Interchange

Layout and signage

N/A   M8


    M8


  Edinburgh
M8 Link
Glasgow
Livingston
M8 Link

Lane configuration

LanesLanesLanesLanesLanes

  • Lane 1 is gained from the entry sliproad.
  • Lane 2 continues ahead.
  • Lane 3 continues ahead.

LanesLanesLanesLanesLanes

  • Lane 1 exits and does not return.
  • Lane 2 continues, with option to exit.
  • Lane 3 continues ahead.

Other events

  • Signs 50mph speed limit begins