A1231 New Wear Crossing

Scheme outline

The New Wear Crossing forms the centrepiece of the Sunderland Strategic Transport Corridor - a 15 year plan to improve links from the city centre and the Port of Sunderland to the A19 and A1, and thus aid in regeneration. By providing a third bridge over the River Wear, the scheme aims to reduce congestion on the two existing bridges (Wearmouth and Queen Alexandra) and the surrounding road network, as well as improving access to development sites.

This scheme involves the construction of a landmark bridge across the River Wear, linking the A1231 Wessington Way on the north side to the B1405 European Way/Pallion New Road on the south side, together with associated link roads. The new bridge will be the tallest in England, with two curving masts up to 187m in height. The new road across the bridge will be dual carriageway and will eventually form part of the A1231.

Subsequent schemes will deal with the upgrade of the existing local road network to provide a continuous dual carriageway from the A19 to the Port of Sunderland.

Timescale
2015-2018
Cost
£
117.6m
Status
In preparation
Type
Bypass or realignment
for use by all traffic
Highway authority
Funding
DfT/ONE North East/Sunderland CC

Progress

What's happening on this scheme? You can add a progress update if you know more. Add a progress update
31 October 2015

The contract for construction has very recently been let and work is expected to begin on-site in the next two or three months.

29 February 2016

Approach roads on both sides underway with the permanent closure of Timber Beech Road. Bridge span work underway.