A465 Gilwern to Brynmawr Dualling

You are here: Home » Road Schemes » A465 Gilwern to Brynmawr Dualling

Scheme Outline

Scheme details

Timescale
2014 - 2017
Status
Under construction
Type
Upgrade to existing road for use by all traffic
Cost
£ 190m
Authority
Welsh Assembly Government
Region: Wales
Finance
Welsh Assembly
Length
8 km
5 miles

Mostly online upgrade of the existing A465 between Gilwern and Brynmawr to dual two-lane standard with full grade separation. Most of this scheme lies within the Brecon Beacons National Park, and the road passes through the ecologically sensitive Clydach Gorge.

The main contractor, Costain, was appointed in June 2011.

This is section two of the Heads of the Valleys project, and is likely to be the fourth of the six sections to be completed.

Is this information out of date? Update this page »

Progress

23 October 2014 Utility and environmental works have begun, and once legal and design matters have been finalised, a construction start is imminent.
24 December 2014 This scheme officially started on 10th December 2014.
24 January 2015 Traffic Management has now started. Speed limit reduced from 50mph to 40mph. Only one lane in each direction in use.
14 October 2015 Buildings have been demolished along the side road, temporary Bailey Bridges have been installed, and tree removal is taking place. The flyover bridge foundations at Gilwern are taking shape. Rock blasting to commence fairly soon to create the East-Bound carriageway.
4 January 2016 From 9th January 2016 the Glanbaiden Roundabout will be shut. Only 'through' traffic east-west or vice-versa, will be unaffected. Gilwern and Govilon traffic will have to travel to the next roundabout and 'U'-turn to get to their destination. This is to enable the Flyover to be built at this junction.
4 September 2016 Glanbaiden Roundabout is now back open. The flyover is almost complete and is expected to be open to traffic by the end of the year. Various re-alignments of the road have taken place and pre-cast concrete structures are being put in place.

What's happening on this scheme? Add a progress report »

More information

Official website
Costain Construction: A465 Section 2

Have you found more information? Add a new link »

Other schemes on the A465

CBRD also has details on the following road schemes happening on the A465.

With thanks to Matt Tovey and Michael Pritchard for information on this page.

This scheme was last updated on 5 September 2016.