A64 Bilbrough Top Improvement

You are here: Home » Road Schemes » A64 Bilbrough Top Improvement

Scheme Outline

Scheme details

Timescale
2004-2005
Status
Completed
Type
Completedfor use by all traffic
Cost
Unknown
Authority
Highways England
Region: Yorkshire and the Humber
Finance
Central Government
Length
N/A

Replacement of the existing crossroads on the A64 between Tadcaster and York with a grade-separated junction, including the installation of a new flyover. This section of road is running well under capacity, with substandard junctions and a poor alignment. It was built during the 1930's, but at each end is connected directly on to modern grade-separated dual carriageway. Bilbrough Top is one of the most dangerous junctions on the route.

Progress

14 September 2004 Construction of the new flyover is well under way.
14 July 2005 The new junction is opened to traffic.

It's over!

This scheme has been completed, so it's no longer possible to edit any of the information on this page.

This scheme was last updated on 26 October 2008.