Scheme Outline

Scheme details

Timescale
2020 - 2022
Status
In planning or on hold
Type
Junction improvement with some parts under motorway restrictions
Cost
£ 25-50m
Authority
Highways England
Region: South East
Finance
Unknown

An upgrade of the existing roundabout and sliproads at the junction between the M25 and A10. The scheme is intended to improve the performance of the junction and improve reliability for all traffic, specifically reducing the regular queues on the sliproads that tail back on to the mainline of the motorway. It also aims to reduce the number of collisions at the junction, improve pedestrian and cycle facilities and increase overall capacity.

At present, three options are proposed, all of which will involve improving the existing layout.

Option 1 would widen the roundabout to three or four lanes throughout, widen the approach from the northbound A10, and provide improved pedestrian/cycle facilities to replace those lost by the widening.

Option 2 is the same as option 1, but with additional widening on the sliproads from the roundabout to the M25 in both directions and a dedicated lane from the clockwise M25 to the northbound A10, bypassing the roundabout.

Option 3 is the same as option 2, with a dedicated bypass lane from the northbound A10 to the anti-clockwise M25 and widening of the southbound A10 to provided a dedicated left turn lane from the junction to the A1055 Bullsmoor Lane.

Is this information out of date? Update this page »

What's happening on this scheme? Add a progress report »

More information

Official website
Highways England: M25 Junction 25 Improvements

Have you found more information? Add a new link »

With thanks to Barry Salter for information on this page.

This scheme was last updated on 31 March 2017.