A465

A465 Dowlais Top to Hirwaun Dualling 24 November 2016

Upgrade of the existing single three-lane A465 Heads of the Valleys Road between Dowlais Top and Hirwaun to provide a grade-separated dual two-lane expressway.

This scheme will be the final upgrade of the complete route from Abergavenny to Neath and will complete the continuous dual carriageway route between the A40 and M4 that has been progressively constructed since the mid-1970s.

Routes
Region

A465 Gilwern to Brynmawr Dualling 5 September 2016

Mostly online upgrade of the existing A465 between Gilwern and Brynmawr to dual two-lane standard with full grade separation. Most of this scheme lies within the Brecon Beacons National Park, and the road passes through the ecologically sensitive Clydach Gorge.

The main contractor, Costain, was appointed in June 2011.

This is section two of the Heads of the Valleys project, and is likely to be the fourth of the six sections to be completed.

Routes
Region

The Heads of the Valleys 24 October 2015

The A465 Heads of the Valleys Road is one of the most spectacular trunk roads in the UK, and building it required some of the most remarkable civil engineering. This is the story of how the road was built in the 1960s, and how it's being rebuilt today.

Routes

Histories

A465 Brynmawr to Tredegar Dualling 15 October 2015

Reconstruction of the A465 between Brynmawr and Tredegar to provide a dual two-lane road with grade separated junctions. This is section three of a larger dualling project that is expected to be completed by 2020.

Routes
Region

A465 Abergavenny to Gilwern Dualling 26 October 2008

Upgrade of the existing single-carriageway road to dual two-lane standard, connecting the existing dual carriageway sections of A40 and A465 at each end. The route will eventually replace all existing single carriageway sections of the A465 between Abergavenny and the M4 with grade separated dual carriageway.

Routes
Region